Engineering and Operations

GPC manages the full life cycle of a project from conceptual design to commissioning and reliable operations. Our team has a track record of operating multiple large scale midstream and power assets while maintaining industry leading health and safety metrics.  

​

Core to our operations philosophy is a culture of transparency, accountability, and alignment with our customers, partners and stakeholders.

Engineering, Procurement and Construction

GPC's team has deep relationships with turbine suppliers and best in class EPCs to ensure the safe and timely commissioning of a power plant. 

 

The team manages detailed engineering, permitting, facility interconnection, procurement, site preparation, equipment installation and commissioning.  

Facility Operations

GPC undertakes all aspects of plant operations to ensure uptime that meets or exceeds the grid. 

 

From operating multiple interconnects for gas supply and power sales, to implementing monitoring and control systems, a robust R&M program, and efficient emissions controls (SCRs), GPC operates with a culture of safety, transparency and accountability.  â€‹

Commodity Risk Management

​With decades of personal experience in the gas and power industry, the GPC Leadership team are subject matter experts in the physical supply of natural as well as commodity risk management across a multitude of energy and environmental markets.  

​

 The experience gained from structuring hundreds of complex energy contracts has been incorporated into our standard PPA, offering data centers competitive pricing, flexibility, and a path to carbon neutrality. 

Health, Safety, Environment and Regulatory 

Power plant operations require the safe handling of fuel, rotating equipment and hazardous materials.  Ensuring the highest standards of safety in line with Process Safety Management guidelines is a core to GPC's operating philosophy. 

​

GPC also emphasizes that all operations are fully compliant with federal and local environmental requirements and works to align interests with stakeholders across the community. 